The standard configuration of prefab house ToplaKuća 196m2
Prefab (prefabricated) blocks
Prefab blocks consist of assembled walls with windows and doors.
The main load-bearing structure is wood d=160+50 mm, consisting of longitudinally connected KVH C24 timber beams w/h=16/6, with a maximum moisture content of 15%. A gypsum-fiber board from Knauf is placed between the layers of the load-bearing and substructure. A vapor barrier with variable water vapor diffusion is installed between the layers of the wooden structure and mineral wool. More details —>
Windows and doors:
- The entrance door is made of PVC and aluminum, with sun protection coating / laminated or float glass, hinge covers in anthracite color (RAL 9011).
- Energy-efficient PVC windows with double-glazed units, tilt-and-turn. The profile is matte black on both sides (RAL 9011). Hinge covers in matte black (RAL 9011). Roller shutters where applicable, see drawings (RAL 9011).
- Interior doors.
Finishing
- Interior finishing with 12 mm drywall, moisture-resistant drywall (12 mm) in bathrooms.
- Exterior finishing with a corrugated metal sheet or click-seam cladding for basic configuration.
- End walls made of planed, oil-painted boards (20×195 mm).
- Quartz-vinyl laminate flooring.
- Bathrooms with quartz-vinyl laminate and ceramic tiles.
Utilities, three bathrooms, sauna
- All electrical work: lighting, sockets, switches, and electrical panel with circuit breakers.
- Water and sewage piping installation.
- Supply and exhaust ventilation in every room.
- Toilet (2), sink (2), bathtub (1), shower cabin (1).
- Mixers.
- Electric underfloor heating in bathrooms.
- Sauna.
Energy independence system
- 36 solar panels.
- 300-liter solar water heater.
- Air-to-water heat pump.
- Sauna.
Additional configuration
- Covered terrace and stairs to the terrace.
- Open terrace.
- Wood-burning stove.
- 3 or 4 panes (2-3 chambers) with argon in PVC windows.
- Rectangular glazing bead profile in PVC windows.
- Swisspacer black profile color for windows and doors.
Additional costs
- Delivery.
- Pile foundation.